Abstract
Rubblization technique has been extensively used to repair the damaged concrete pavement and has proven successful in developed countries like the US
and Europe. It has not been fully adopted in developing region like the Middle East and this paper presents the design and construction challenges posed
while assessing damaged concrete runway in empty quarter of Saudi Arabia.
A number of design options for repairs for runway pavement were considered
and rubblization was chosen as a preferred option for repair. This paper includes the consideration for the assessment and adoption of the concrete
rubblized modulus value using the falling weight deflectometer, optimization
of the tests for the whole runway using the Heavy Weight Deflectometer HWD
testing to replace pits, safely working around the utilities, reasonable assumption of drop height of the pavement and installation of utility conduits in the
rubblized layer. Findings of the paper demonstrates resolving technical issues
which are not very well covered in the Federal Aviation Authority (FAA)
EB-66 such as the additional test strips, minimum areas of rubblization for
assessment using test pits, drop in the height of concrete surface and fixing of
utilities in rubblized pavement. The case study demonstrates that the rubblization can be successfully carried out in remote locations like empty quarter
of Saudi Arabia with carefully carried out detailed site investigations, adopting correct assumed design rubblization modulus, quality control using HWD,
protection of utilities while rubblizing and use of polymer modified asphalt
for successful project deployment.
Keywords
Rubblization
Reinforced Concrete Pavement
Test Pits
Reflective Cracking
Modulus
Rubblization Modulus
Super Pave
Heavy Weight
Deflectometer (HWD)
FAARFIELD
Federal Aviation Authority (FAA)